Home  //  Events  //  iBuild  //  Plan-It
Plan-It
Share on Facebook

Introduction


An event to test the basis of every structure – its design!

Start from the root of the structure. All you have is a basic plot of land. Design a building plan for the allotted plot of land. Unleash your imagination to design a structure of your choice – be it a bungalow or a multistory building. Show us your dream structure ready with its blueprint – all with computer-based software to aid your design process on stand-by! Run your thoughts amok and dazzle us with a display of what you would do given a plot of land.You’re not thinking it would be that easy now, are you?

The catch is, your design must adhere to the current Development Control Regulations stipulated by the government! Plan a structure that doesn't flout any current government norms.

Challenge the architect in you! Plan it!

Rules and Guidelines


PARTICIPATION:

  • A group of maximum two shall participate.
  • All architectural and civil engineering students (degree & diploma) except first year students are eligible to participate.

TIME DURATION:

  • A time period not extending more than three weeks shall be provided to the participants.
  • Note: The time period shall start from the date when the plot area is displayed on the website.
  • The submissions stated below should be submitted online within the stipulated time frame.

JUDGING CRITERIA:

The participants will be judged on the basis of how well they have adhered to the Problem Statement and how tactfully have they utilized the plot area provided.

*The decision of the judges is final and binding on all.

Problem Statement

Plan a multistoreyed residential building in the given plot taking into consideration the general building planning rules and regulations.

The following points should be taken into account while planning the building:

Type of building:

The building to be planned is a residential building with provision of necessary facilities to the occupants. The structure to be planned is a RCC structure.

Principles of planning:

The building should follow the general principles of planning such as aspect, prospect, orientation, etc. of different rooms of the building.

Development Control Regulations (DCR) – Mumbai region:

The building should be planned with respect to the DCR of Mumbai region and should take into consideration the various points in the DCR such as F.S.I. of the area of the plot, setbacks, open spaces, etc.

Facilities:

Provisions shall be made for facilities like car parking, recreational areas, etc

RULES AND REGULATIONS:

  • Planning the building in the given plot area should be done according to the following norms:
  • The plot is located in the island city of Mumbai.
  • A maximum FSI of 1.33 is allotted.
  • The buildings should be planned with 1BHK & 2BHK flats.
  • Number of occupants considered in a 1BHK & 2BHK flat will be 4 & 6 respectively.
  • The participants are expected to plan the building keeping in view the principles of planning and byelaws in Development Control Regulations (DCR) of Mumbai region applicable.
  • The basic facilities for occupants should be taken care of.
  • The residential complex adjacent to the plot consists of a G+4 storied building of height 16 m.
  • Any assumptions made should be noted in the document attached with the drawings.
  • For the reference of the participating teams, DCR 2010 – Mumbai region is made available.

CRITERIA FOR ASSESSMENT:

A plan providing accommodation to maximum number of occupants with the necessary facilities keeping in view the rules and regulations of building planning shall be selected.

Architectural beauty and elegance in appearance shall be also considered.

Submissions


SUBMISSIONS:

The following documents should be submitted within the given time duration:

1. CAD Drawings:

The following drawings shall be submitted by the participating teams:

Floor Plans (if the building consist of typical floors, single plan stating the floor nos. shall be submitted; otherwise plan of each floor should be submitted)

Front and side elevation.

Area statement stating the total built-up area, plot area and F.S.I. consumed.

2. Site Plan

3. Document:

A document to the effect of the following should also be submitted in a pdf format (preferred) or in a word format:

Document explaining the idea regarding your planning, byelaws used and assumptions made should be submitted.

5. References:

It should be noted that the drawings submitted by the participating teams shall be assessed with respect to the details in the documentation submitted by them. So the same shall be prepared with utmost importance.

 

Contact Us

In case of any queries, doubts, please feel free to contact us:

Event Heads:

Shyam Nair - +91 9702754901

e-mail ID : This e-mail address is being protected from spambots. You need JavaScript enabled to view it

General Manager:

Poorva Bonde - +91 8087471806

e-mail ID : This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Aditya Sohoni - +91 9920648865

e-mail ID : This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Downloads

Attachments:
Plot[ ]30 Kb